flow shop; scheduling; assembly operations; branch and bound

向作者/读者索取更多资源

Hybrid scheduling for the production system including parts machining and assembly operations is studied. Several products of different kinds are ordered to be produced and parts for the products are manufactured in the flow-shop consisting of multiple machines. Each product is produced by hierarchical assembly operations from the parts. Several parts are assembled into the first sub-assembly, and several other parts and the first sub-assembly are assembled into the second sub-assembly. These assembly operations are continued until the last sub-assembly that is the final product is obtained. In this paper, the problem to obtain a schedule having the minimum weighted sum of completion time of each product is considered. The decision variables are the sequence of products to be assembled and the sequence of parts to be processed. A technique to get better lower bounds and a calculation procedure using branch and bound method is developed to obtain an optimum or e-optimum. schedule. The meaning of the model is demonstrated by a numerical example and the effectiveness of the proposed calculation procedure is shown by several computational experiments. (C) 2001 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据