A fuzzy approach to construction project risk assessment and analysis: construction project risk management system

期刊

ADVANCES IN ENGINEERING SOFTWARE
卷 32, 期 10-11, 页码 847-857

出版社

ELSEVIER SCI LTD
DOI: 10.1016/S0965-9978(01)00036-9

关键词

qualitative risk assessment and management; fuzzy logic; linguistic variables

向作者/读者索取更多资源

The construction industry is plagued by risk, and poor performance has often been the result. Although risk management techniques have been applied, the lack of a formalised approach has produced inconsistent results. In this paper, a hierarchical risk breakdown structure is described to represent a formal model for qualitative risk assessment. The relationships between risk factors, risks, and their consequences are represented on case and effect diagrams. Risk descriptions and their consequences can be defined using descriptive linguistic variables. Using fuzzy approximation and composition, the relationships between risk sources and the consequences on project performance measures can be identified and quantified consistently. (C) 2001 Civil-Comp Ltd and Elsevier Science Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据