4.5 Article

Truck scheduling for ground to air connectivity

期刊

JOURNAL OF AIR TRANSPORT MANAGEMENT
卷 7, 期 6, 页码 331-338

出版社

ELSEVIER SCI LTD
DOI: 10.1016/S0969-6997(01)00014-X

关键词

-

向作者/读者索取更多资源

A critical link in the overnight package business is the on-time arrival of trucks at airport terminals. Truck delays can delay the package sorting and transfer process, which can in turn delay aircraft departures from the local terminal, as well as aircraft departures from hub terminals that depend on timely aircraft arrivals. This paper models the airport terminal as a queueing process with random bulk arrivals. Predictions are provided for expectation, and standard deviation, of arrived work. From these predictions performance measures are developed for sort end time and sort starvation. Particular attention is given to scheduling the start time for the sorting process, to balance a trade-off between maximizing sort productivity and minimizing the end time of the sort. The methods are being implemented as a web-based scheduling tool. (C) 2001 Elsevier Science Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据