Predicting construction cost overruns using text mining, numerical data and ensemble classifiers

期刊

AUTOMATION IN CONSTRUCTION
卷 43, 期 -, 页码 23-29

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2014.02.014

关键词

Construction cost; Data mining; Text mining; Prediction

向作者/读者索取更多资源

This paper discusses how text describing a construction project can be combined with numerical data to produce a prediction of the level of cost overrun using data mining classification algorithms. Modeling results found that a stacking model that combined the results from several classifiers produced the best results. The stacking ensemble model had an average accuracy of 43.72% for five model runs. The model performed best in predicting projects completed with large cost overruns and projects near the original low bid amount. It was found that a stacking model that used only numerical data produced predictions with lower precision and recall. A potential application of this research is as an aid in budgeting sufficient funds to complete a construction project. Additionally, during the planning stages of a project the research can be used to identify a project that requires increased scrutiny during construction to avoid cost overruns. (C) 2014 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据