A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects

期刊

AUTOMATION IN CONSTRUCTION
卷 35, 期 -, 页码 157-173

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2013.05.023

关键词

Look-ahead schedule (LAS); Automation; Scheduling; Computer simulation; Resource-constrained project scheduling problem (RCPSP)

向作者/读者索取更多资源

Look-ahead schedules (LASs) in the finishing phase of complex projects produced with sufficient detail can help prevent conflict, ensure correct work sequence, and facilitate a fluent workflow for a crew, preventing rework. Unfortunately, such LASs are rarely used in these projects because of the time-consuming schedule generation process, the high probability of introducing errors into the LASs and the inability to find the close-to-optimum LAS from the vast number of feasible alternatives. This paper proposes an automated LAS generation (ALASG) method addressing these challenges. A software prototype developed based on the ALASG method is presented and a simulation-based approach is introduced to find close-to-optimum LASs quickly in terms of construction duration or cost for a case study. The proposed method contributes to the field of automated project scheduling, particularly automated look-ahead scheduling, through the quick generation of error-free, close-to-optimum LASs for the finishing phase of complex projects. (C) 2013 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据