Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO

期刊

AUTOMATION IN CONSTRUCTION
卷 20, 期 4, 页码 321-327

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2010.11.002

关键词

Shield machine; Earth pressure balance; Control; LS-SVM; PSO

资金

  1. National Basic Research Program (973 Program) of China [2007CB714006]

向作者/读者索取更多资源

To avoid ground deformation in the process of earth pressure balance (EPB) shield tunneling, it is necessary to keep the earth pressure balance on excavation face. However, at present the earth pressure control depends mainly on operation experiences which is hysteretic and could result in slow response to the change of earth pressure. To solve these problem, a predictive control strategy for earth pressure balance during excavation is proposed in this paper, where an earth pressure prediction model taking advance speed and screw conveyor speed as the control parameters is established by means of least squares support vector machine (LS-SVM). Further, by minimizing the difference between the predicted earth pressure and the desired one, an optimization model of the control parameters is established, and solved by the particle swarm optimization (PSO) algorithm. Therefore, an optimal EPB control scheme for shield tunneling automatically is presented here. The simulation results demonstrate that the method presented in this paper is very effective to control earth pressure balance. (C) 2010 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据