Optimal schedule adjustments for supplying ready mixed concrete following incidents

期刊

AUTOMATION IN CONSTRUCTION
卷 20, 期 8, 页码 1041-1050

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2011.04.005

关键词

Ready mixed concrete; Incident; Schedule adjustment; Truck dispatching; Network flow

资金

  1. National Science Council of Taiwan [NSC-98-2221-E-008-077-MY3]

向作者/读者索取更多资源

In this study, the authors develop a systematic network flow model designed to help RMC carriers effectively adjust schedules following RMC mixer breakdowns. A time-space network technique is employed to formulate the production of the RMC and truck fleet flows in the dimensions of time and space. A solution algorithm, incorporating a problem decomposition technique and the use of a mathematical programming solver, is developed to efficiently solve the problem. Finally, the model and solution method are evaluated by performing a case study. The test results show that, with the application of the model and the solution algorithm, mixer breakdowns do not lead to much deterioration in the system operating performance. In addition, the system operating cost is significantly improved (by 10.75%) compared to that obtained using the manual approach. As a result, the model and the solution algorithm could be useful for actual operations. (C) 2011 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据