4.6 Article

New factors for capital cost estimation in evolving process designs

期刊

CHEMICAL ENGINEERING RESEARCH & DESIGN
卷 80, 期 A6, 页码 579-586

出版社

INST CHEMICAL ENGINEERS
DOI: 10.1205/026387602760312773

关键词

capital cost estimation; plant costs; equipment costs; factored estimates; Lang factor

向作者/读者索取更多资源

Capital cost assessment is an integral part of an evolving process design. The assessment should consider installed equipment costs inclusive of plant bulk items and not solely purchased equipment costs. The ratio of installed equipment cost to purchased equipment cost varies much more widely for individual equipment items than for entire plants; the ratio depends on equipment class, design, size and construction materials as well as plant layout. The factored (IChemE) method outlined in the Institution of Chemical Engineers 'blue booklet' is of immediate use and provides a basis for checking detailed estimates. Some experience in the application of the IChemE method by the authors is reviewed. Recommendations are made for broadening the inputs for estimating, and some factors are proposed for estimating installed costs of equipment of different classes. Quantitative data are also presented for cost breakdown in entire plants arising from project reviews by the authors.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据