4.6 Article

Problems facing parties involved in build, operate, and transport projects in Egypt

期刊

JOURNAL OF MANAGEMENT IN ENGINEERING
卷 18, 期 4, 页码 173-178

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0742-597X(2002)18:4(173)

关键词

-

向作者/读者索取更多资源

One of the newest financial schemes for environmental projects is the Build, Operate, and Transfer (BOT) concept, which is being used increasingly worldwide as a project delivery system by which governments obtain the infrastructure projects by private sector after a concession period free of charge. In the Egyptian environment up to now, promoters and investors have had many fears toward declared projects. This study aims to investigate the potential for implementing the BOT system in the Egyptian environment. This can be achieved by giving a clear view of BOT and of its problems, risk areas, and features, pertaining to the Egyptian environment, in order to maximize the benefits and minimize the risks as much as possible. The collected data was analyzed based on actual implementation in Egypt. This involved the following: (1) An overview of the critical success factors in order to achieve a BOT project; (2) an analysis of results obtained from questionnaires seeking to determine the possibility of occurrence of the different risk factors in the Egyptian environment, and their ranking-, (3) a comparison between the questionnaire results and the actual risks from requests for the proposal of locally advertised projects; and (4) a determination of the missed critical success factors in the Egyptian environment. The main conclusion of this study is that three critical success factors are essential for the success of BOT projects in Egypt: (1) Picking the right project; (2) competitive financial proposal; and (3) special features of bid.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据