PRODUCTION PLANNING & CONTROL
卷 13, 期 7, 页码 639-648出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/0953728021000026249
关键词
job shops; assembly jobs; scheduling; simulation; due date performance
The effects of a number of essentially different work order release and flow time allowance policies on the assembly order flow times and assembly order due date performance are investigated. Work orders within an assembly order have different routing length. The assembly order flow time is the time that elapses between the release of the first work order and the completion of the last work order of the assembly order. The timing of the release of work orders, and the distribution of the flow time allowance over the work orders in an assembly order were varied, and used systematic computer simulation to investigate the effects on performance. The results show that the best performance is obtained with simultaneous work order release, an average operation flow time allowance equal to the average operation waiting time and equalized flow time allowances per work order in an assembly order.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据