4.7 Article

Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 143, 期 1, 页码 115-124

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0377-2217(01)00328-9

关键词

flexible manufacturing systems; balancing; scheduling; mixed integer programming

向作者/读者索取更多资源

A monolithic and a hierarchical approach are presented for balancing and scheduling of a flexible assembly line (FAL). The system is made up of a set of assembly stations in series, each with limited work space and is capable of simultaneously producing a mix of product types. The objective is to determine an assignment of assembly tasks to stations and an assembly schedule for all products so as to complete the products in minimum time. In the monolithic approach balancing and scheduling decisions are made simultaneously. In the hierarchical approach, however, first the station workloads are balanced, and then detailed assembly schedule is determined for prefixed task assignments and assembly routes by solving a permutation flowshop problem. Mixed integer programming formulations are presented for the two approaches. Numerical examples are included to illustrate and compare the approaches and some computational results are reported. (C) 2002 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据