On latest starting times and floats in activity networks with ill-known durations

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 147, 期 2, 页码 266-280

出版社

ELSEVIER
DOI: 10.1016/S0377-2217(02)00560-X

关键词

scheduling; critical path analysis; PERT; intervals; fuzzy intervals

向作者/读者索取更多资源

This paper deals with fuzzy activity networks, where fuzzy intervals model uncertain durations of tasks. While it is easy to compute fuzzy earliest starting times of activities using the critical path method, the problem of determining latest starting dates and slack times is much more tricky and has never been solved in a fully satisfactory manner in the past. Here we propose a rigorous treatment of this problem in the framework of possibility theory. The main difficulty lies in the fact that the behavior of latest starting dates and slack times, as a function of task durations, is not straightforward to predict for general network topologies. However, it is easier in the case of series-parallel graphs. The case of interval-valued durations is first addressed, and then extended to fuzzy intervals. (C) 2002 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据