4.7 Article Proceedings Paper

Handling flexibility in a generalised job shop with a fuzzy approach

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 147, 期 2, 页码 312-333

出版社

ELSEVIER
DOI: 10.1016/S0377-2217(02)00563-5

关键词

scheduling problems; generalised job shop; fuzzy logic; flexible parameters

向作者/读者索取更多资源

In this paper, we deal with a particular scheduling problem inspired by a practical case coming from a Belgian Pharmaceutical Company. This problem has some particularities with respect to the 'classical job shop problem'. The principal one is the existence of a delay between the end of an operation and the start of the next operation of the same job. This delay is not fixed but belongs generally to an interval range of possible values. A resolution method (the horizon method) has been proposed in the deterministic case (fixed data and strict constraints). In this method, the horizon time of each machine is discretised by unit times and at each unit time a binary value is associated; all the operations applied on the machines horizons are logic operations (OR, AND, right or left shifting and so on). Unfortunately, this method does not take into account several aspects of the problem: the existence of a preference relation on the possible values of the delay between successive operations and of flexible due dates. In this work, we modelise such flexible parameters using the fuzzy logic. We propose a new method generalizing the horizon method. This new method try to find (for the realisation of the jobs) a compromise between the choice of good values for the delay between couples of successive operations of the same job and good values for the completion time of the jobs. (C) 2002 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据