3.8 Article

Project delivery systems and project change: Quantitative analysis

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2003)129:4(382)

关键词

delivery; project management; design build

向作者/读者索取更多资源

Design/build has become one of the favored project delivery methods in the engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. A comprehensive analysis of 67 global projects from the Construction Industry Institute's database shows that design/build projects may not provide all the benefits to project performance. The study found timesaving was a definitive advantage of design/build project delivery, but, the positive effects of cost and productivity changes were not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据