4.6 Article Proceedings Paper

Operating theatre planning

期刊

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0925-5273(03)00087-2

关键词

hospital planning; capacity constraint production planning with fixed costs; assignment problem; network programming; heuristics

向作者/读者索取更多资源

N patients must be planned in an operating theatre over a medium term horizon (one or two weeks). This operating theatre is composed of several operating rooms and of one recovery room where several beds are available. Each patient needs a particular surgical procedure, which defines the human (surgeon) and material (equipment) resources to use and the intervention duration. Additive characteristics must be taken into account: hospitalisation date, intervention deadline, etc. The patient satisfaction and resource efficiency are sought. These two criteria are, respectively, modelled by hospitalisation costs, i.e. the patient stay duration, and the overtime costs, i.e. the resource overloads. We propose to solve this problem in two steps. First, an operating theatre planning is defined. It consists in assigning patients to operating rooms over the horizon. Second, each loaded operating room is scheduled individually in order to synchronise the various human and material resources used. This paper focuses on the first step, i.e. the operating theatre planning, which defines a general assignment problem, i.e. a NP hard problem. In order to solve heuristically this problem, an assignment model with resource capacity and time-window additive constraints is proposed. Integrating most of the constraints in the cost objective function, an extension of the Hungarian method has been developed to calculate the operating theatre planning. This primal-dual heuristic has been successfully experimented on a wide range of problem test data. (C) 2003 Elsevier Science B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据