4.3 Article

Scheduling groups of tasks with precedence constraints on three dedicated processors

期刊

DISCRETE APPLIED MATHEMATICS
卷 134, 期 1-3, 页码 141-168

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/S0166-218X(03)00302-0

关键词

scheduling; normal schedule; comparability graph; maximum clique weight; approximation algorithm

向作者/读者索取更多资源

We study the problem of scheduling groups of tasks with precedence constraints on three dedicated processors. Each task requires a specified set of processors. Up to three precedence constraints are considered among groups of tasks requiring the same set of processors. The objective of the problem is to find a nonpreemptive schedule which minimizes the maximum completion time (makespan). This scheduling problem is equivalent to the problem of finding an extension of the constraint graph (i.e. the graph which represents the conflicts between tasks and the precedence constraints) to a comparability graph with minimum (over all the extensions) maximum clique weight. The problem is NP-hard in the strong sense. A normal schedule is such that all the tasks requiring the same set of processors are scheduled consecutively. With a normal schedule the problem reduces to the quotient graph of the constraint graph. In this paper we obtain tight approximation results for the minimum makespan of a normal schedule through tight results on the minimum increase of the maximum clique weight when the (partially oriented) quotient graph is extended to a comparability graph. (C) 2003 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据