3.8 Article

Need-based project prioritization: Alternative to cost-benefit analysis

期刊

JOURNAL OF TRANSPORTATION ENGINEERING-ASCE
卷 130, 期 2, 页码 150-158

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-947X(2004)130:2(150)

关键词

benefit-cost ratios; highway improvements; Kansas; project planning

向作者/读者索取更多资源

This paper presents a need-based methodology to prioritize and select highway projects for improvement. This approach is based on developing a multiattribute need function that quantifies relative concerns of a highway agency and the traveling public about various physical and operational deficiencies on different highway segments. It is an effective alternative to the traditional cost-benefit analysis. While the cost-benefit analysis may be useful in evaluating a small number of project alternatives at a fixed location (e.g., alternative alignments for a single corridor), it has major limitations when applied to a large-scale (e.g., statewide) highway construction program. This paper discusses some of the philosophical and practical limitations of the cost-benefit analysis and how the need-based approach overcomes these limitations. A successful implementation of the need-based approach to Kansas's statewide highway improvement program is also described.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据