4.6 Article

Framing realistic river rehabilitation targets in light of altered sediment supply and transport relationships: lessons from East Gippsland, Australia

期刊

GEOMORPHOLOGY
卷 58, 期 1-4, 页码 107-123

出版社

ELSEVIER
DOI: 10.1016/S0169-555X(03)00227-7

关键词

river recovery; channel metamorphosis; riparian vegetation; woody debris; sediment budget; river rehabilitation

向作者/读者索取更多资源

Since European settlement, the Cann River in East Gippsland, Victoria has experienced a 700% increase in channel capacity, a 150-fold increase in the rate of lateral channel migration, a 45-fold increase in bankfull discharge and a 860-fold increase in annual sediment load. Over the last century, and primarily the last 40 years, channel incision has removed the equivalent of around 1500 years of floodplain deposition. A numerical floodplain evolution model is presented which suggests that under a best case scenario, infilling the incised channel trench will take 3 1,000 years and this is predicated on the fall recovery of the immediate riparian vegetation and the in-channel loading of woody debris. The asymmetry in the recovery time following rapid channel change, compared with the original deposition of the material, is explained by a combination of the sediment-starved character of the catchment and the altered hydraulic conditions within the channel, principally associated with the role of woody debris. These factors have major implications for geomorphic recovery potential, constraining what can be realistically achieved in river rehabilitation. (C) 2003 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据