期刊
NAVAL RESEARCH LOGISTICS
卷 51, 期 3, 页码 307-315出版社
WILEY
DOI: 10.1002/nav.10107
关键词
flowshop scheduling; machine availability; fully polynomial; time approximation scheme
We study a deterministic two-machine flowshop scheduling problem with an assumption that one of the two machines is not available in a specified time period. This period can be due to a breakdown, preventive maintenance, or processing unfinished jobs from a previous planning horizon. The problem is known to be NP-hard. Pseudopolynomial dynamic programming algorithms and heuristics with worst case error bounds are given in the literature to solve the problem. They are different for the cases when the Unavailability interval is for the first or second machine. The existence of a fully polynomial time approximation scheme (FPTAS) was formulated as an open conjecture in the literature. In this paper, we show that the two cases of the problem under study are equivalent to similar partition type problems. Then we derive a generic FPTAS for the latter problems with O(n(5)/epsilon(4)) time complexity. (C) 2003 Wiley Periodicals, Inc.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据