4.2 Article

Numerical modeling of borehole-to-surface logging technology based on incomplete Cholesky conjugate gradient

期刊

ARABIAN JOURNAL OF GEOSCIENCES
卷 6, 期 7, 页码 2237-2243

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s12517-012-0545-2

关键词

Borehole-to-surface logging; Finite difference method (FDM); Forward modeling; Incomplete Cholesky conjugate gradient (ICCG)

向作者/读者索取更多资源

For vertical line source, the total potential is divided into normal potential and abnormal one to eliminate singularity in this paper. Normal potential produced in homogeneous half-space is calculated by analytic method. While for abnormal potential produced by underground anomalous body, the finite difference method is used based on differential equation of abnormal potential. Further, the total potential is calculated and the forward is realized. Accordingly, incomplete Cholesky conjugate gradient that is introduced in this paper gives the analytical solution of equation, it converges more quickly while requiring less memory. It is an initiation to introduce a dipping bed model to indicate potential distribution produced by underground anomalous body.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据