4.5 Article

Predicting Order Due Date

期刊

ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING
卷 37, 期 6, 页码 1751-1766

出版社

SPRINGER HEIDELBERG
DOI: 10.1007/s13369-012-0279-1

关键词

Predicting; Due date; Lead times; Distribution function; Sampling

向作者/读者索取更多资源

The paper presents a procedure for predicting due date of production orders on the basis of past actual lead time data. A client for a particular production order will select the best bidder. It is rather risky to make a bid just on the basis of sales experience. A procedure is therefore proposed by which, on the basis of the actual lead times of operational and assembly orders processed in the company's workplaces in the past, the expected lead time of a planned production order can be predicted. The result of the proposed procedure for predicting lead times is an empirical distribution of possible lead times for a production order. On the basis of this distribution, it is possible to predict the probable lead time of a production order, taking into account a confidence interval. Using the proposed procedure, the sales department can make a delivery time prediction for the customer of the planned production order. As an illustration of using the procedure for predicting lead times of production orders, a case study is presented: the lead time of a production order for a linking element of an oil vent was predicted; the tool is manufactured by a Slovenian company.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据