4.7 Article

Multi-criteria selection for a wind observation station location using analytic hierarchy process

期刊

RENEWABLE ENERGY
卷 29, 期 8, 页码 1383-1392

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2003.12.020

关键词

wind-speed observation station; AHP; location selection

向作者/读者索取更多资源

Projecting wind-power plants depends on the amount of the power that the plant can support. The location chosen for the project needs to be evaluated in consideration of different criteria when determining the potentiality of the wind-power. Measuring the wind-speed and the wind-path through equipment in prospective wind observation station play an important role in such later stages as evaluation of data, determination of the amount of energy and choosing the wind tribune. In this study, the aim was to determine the most convenient location for a wind observation station to be built on the campus of a university using analytic hierarchy process (AHP). (C) 2004 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据