期刊
RENEWABLE ENERGY
卷 29, 期 8, 页码 1383-1392出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.renene.2003.12.020
关键词
wind-speed observation station; AHP; location selection
Projecting wind-power plants depends on the amount of the power that the plant can support. The location chosen for the project needs to be evaluated in consideration of different criteria when determining the potentiality of the wind-power. Measuring the wind-speed and the wind-path through equipment in prospective wind observation station play an important role in such later stages as evaluation of data, determination of the amount of energy and choosing the wind tribune. In this study, the aim was to determine the most convenient location for a wind observation station to be built on the campus of a university using analytic hierarchy process (AHP). (C) 2004 Elsevier Ltd. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据