Conceptual cost estimation of building projects with regression analysis and neural networks

期刊

CANADIAN JOURNAL OF CIVIL ENGINEERING
卷 31, 期 4, 页码 677-683

出版社

NATL RESEARCH COUNCIL CANADA
DOI: 10.1139/L04-029

关键词

conceptual cost estimation; regression analysis; neural networks; range estimation

向作者/读者索取更多资源

Conceptual cost estimates play a crucial role in initial project decisions, although scope is not finalized and very limited design information is available during early project stages. In this paper, the advantages and disadvantages of the current conceptual cost estimation methods are discussed and the use of regression, neural network, and range estimation techniques for conceptual cost estimation of building projects are presented. Historical cost data of continuing care retirement community projects were compiled to develop regression and neural network models. Three linear regression models were considered to identify the significant variables affecting project cost. Two neural network models were developed to examine the possible need for nonlinear or interaction terms in the regression model. Prediction intervals were constructed for the regression model to quantify the level of uncertainty for the estimates. Advantages of simultaneous use of regression analysis, neural networks, and range estimation for conceptual cost estimating are discussed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据