期刊
APPLIED SOFT COMPUTING
卷 19, 期 -, 页码 80-85出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.asoc.2014.01.040
关键词
Project scheduling; Time-cost trade-off; Fuzzy random theory; Fuzzy random simulation; Genetic algorithm
资金
- National Natural Science Foundation of China [71371141, 71001080, 71103128]
In real projects, the trade-off between the project cost and the project completion time, and the environmental uncertainty are aspects of considerable importance for managers. For complex environment with more than one type of uncertainty, this paper presents three types of time-cost trade-off models, in which the project environment is described via introducing the fuzzy random theory. The expected value and the chance measure of fuzzy random variable are introduced for modeling the problem under different decision-making criteria. After that, this paper is devoted to designing a searching method integrating the technique of fuzzy random simulations and genetic algorithm for searching the quasi-optimal schedules. Finally, some numerical examples are given to demonstrate the effectiveness of the designed method for solving the proposed models. (C) 2014 Elsevier B.V. All rights reserved.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据