4.4 Article

High beam current operation of a PETtrace™ cyclotron for 18F- production

期刊

APPLIED RADIATION AND ISOTOPES
卷 70, 期 6, 页码 922-930

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.apradiso.2012.03.007

关键词

[F-18]FDG synthesis; High target current; PETtrace cyclotron; Radiolysis; Niobium targets; High power target

向作者/读者索取更多资源

Upgrades and optimisation achieved 160 mu A total target current operation of a GE PETtrace cyclotron in dual target mode for the routine production of [F-18]FDG for > 2 years. Approximately 900 GBq of F-18(-) and > 500 GBq of [F-18]FDG can be produced routinely in a single production run, meeting the routine [F-18]FDG requirements with our customer base and achieving economies of scale. Production of > 1 TBq of F-18(-) in a single run was achieved. Reliability, saturation and synthesis yields were not adversely affected. Crown Copyright (c) 2012 Published by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据