3.8 Article

Production process for manufactured housing

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2004)130:5(708)

关键词

manufactured homes; production planning; production engineering; simulation; simulation models

向作者/读者索取更多资源

A manufactured home is completely built, in a controlled factory environment. Despite a large share of the market, the manufactured housing industry has a long way to go towards streamlining its production process. The objective of this paper is to map the production process of a manufactured housing factory and to demonstrate via simulation how the process can be improved. The production process including assembly, feeder, and storage stations were mapped using data from several manufactured housing plants and in-depth case studies at two plants in northern Indiana. The case study plants were also used for collecting cycle-time data for developing the simulation model for the roofing process. Subsequently, four what if scenarios were conducted to illustrate potential improvements to the production process. The efforts presented in this paper are part of on-going research sponsored by the National Science Foundation under the Partnership for Advancement of Technology in Housing (PATH) initiative.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据