4.6 Article

Production scheduling in a steelmaking-continuous casting plant

期刊

COMPUTERS & CHEMICAL ENGINEERING
卷 28, 期 12, 页码 2823-2835

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.compchemeng.2004.08.031

关键词

scheduling; production planning; steelmaking

向作者/读者索取更多资源

In this paper we describe an optimization procedure for planning the production of steel ingots in a steel making-continuous casting plant. The strict requirements of the production process defeated most of the earlier approaches to steelmaking-continuous casting production scheduling. mainly due to the lack of information in the optimization models. Our formulation of the problem is based on the alternative graph, which is a generalization of the disjunctive graph of Roy and Sussman. The alternative graph formulation allow us to describe in detail all the constraints that are relevant for the scheduling problem. We then solve the problem by using a beam search procedure, and compare our results with a lower bound of the optimal solutions and with the actual performance obtained in the plant. Computational experience shows the effectiveness of this approach. (C) 2004 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据