Scheduling flexible flow lines with sequence-dependent setup times

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 159, 期 1, 页码 66-82

出版社

ELSEVIER
DOI: 10.1016/S0377-2217(03)00401-6

关键词

scheduling; heuristics; genetic algorithms; flexible flow lines

向作者/读者索取更多资源

This paper examines scheduling in flexible flow lines with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. An integer program that incorporates these aspects of the problem is formulated and discussed. Because of the difficulty in solving the IP directly, several heuristics are developed, based on greedy methods, flow line methods, the Insertion Heuristic for the Traveling Salesman Problem and the Random Keys Genetic Algorithm. Problem data is generated in order to evaluate the heuristics. The characteristics are chosen to reflect those used by previous researchers. A lower bound has been created in order to evaluate the heuristics, and is itself evaluated. An application of the Random Keys Genetic Algorithm is found to be very effective for the problems examined. Conclusions are then drawn and areas for future research are identified. (C) 2003 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据