4.7 Article

A multi-objective train scheduling model and solution

期刊

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.trb.2004.02.004

关键词

multi-objective programming; train scheduling; pareto frontier; epsilon-constraint method; distance-based methods

向作者/读者索取更多资源

This paper develops a multi-objective optimization model for the passenger train-scheduling problem on a railroad network which includes single and multiple tracks, as well as multiple platforms with different train capacities. In this study, lowering the fuel consumption cost is the measure of satisfaction of the railway company and shortening the total passenger-time is being regarded as the passenger satisfaction criterion. The solution of the problem consists of two steps. First the Pareto frontier is determined using the e-constraint method, and second, based on the obtained Pareto frontier detailed multi-objective optimization is performed using the distance-based method with three types of distances. Numerical examples are given to illustrate the model and solution methodology. (C) 2004 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据