Biological nitrogen and organic matter removal from tannery wastewater in pilot plant operations in Ethiopia

期刊

APPLIED MICROBIOLOGY AND BIOTECHNOLOGY
卷 66, 期 3, 页码 333-339

出版社

SPRINGER
DOI: 10.1007/s00253-004-1715-2

关键词

-

向作者/读者索取更多资源

The objective of this study was to set-up a pilot plant and to evaluate its effectiveness for biological nitrogen and organic matter removal from tannery wastewater in Ethiopia. A pilot wastewater treatment plant consisting of a predenitrification-nitrification process was constructed and operated for 6 months. This was fed with a raw tannery wastewater obtained from the Modjo Tannery located 70 km south of the capital, Addis Ababa. Up to 98% total nitrogen and chemical oxygen demand, and 95% ammonium nitrogen removal efficiencies were achieved in the system. The average effluent ammonium nitrogen ranged from 8.4 mg l(-1) to 86.0 mg l(-1), whereas the average effluent for nitrate nitrogen ranged from 2.9 mg l(-1) to 4.4 mg l(-1). The average values of denitrification and nitrification rates determined by nitrate and ammonium uptake rates (NUR and AUR) were 8.0 mg NO3-N [g volatile suspended solids (VSS)](-1) h(-1) and 5.4 mg NH4-N (g VSS)(-1) h(-1), respectively, demonstrating that the treatment processes of the pilot plant were effective. Further studies of the effect of chromium III on AUR showed 50% inhibition at a concentration of 85 mg l(-1), indicating that this metal was not causing process inhibition during performance operations. Thus, the predenitrification-nitrification process was found to be efficient for simultaneous removal of nitrogen and organic substrates from tannery wastewaters.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据