4.0 Article

The long-term mine production scheduling problem

期刊

IIE TRANSACTIONS
卷 37, 期 2, 页码 109-121

出版社

TAYLOR & FRANCIS INC
DOI: 10.1080/07408170490447339

关键词

-

向作者/读者索取更多资源

Recognizing the complexity of coal mining management, e.g., the scarcity of financial resources and a variation in the quality of coal found in different sections of a mine, in this paper, we develop a mixed-binary programming model as an aid for generating mine production schedules in order to obtain coal of the desired quality and maximize the associated net present value. The model is based on the definition of the mine layout as a precedence network, with the nodes representing mining sections. A general solution methodology based on the Benders' decomposition of the model is developed. It exploits the special nature of the resulting subproblems in order to develop an effective solution procedure. Computational experience of this procedure, along with the results of its application to a mining case, are presented.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.0
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据