Risk concession model for build/operate/transfer contract projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0733-9364(2005)131:2(211)

关键词

-

向作者/读者索取更多资源

This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to establishing a risk concession model for BOT contract projects. The decision for a concession period is one of the most important decisions in determining a BOT contract. BOTCcM presents an alternative method to assist in determining a concession period that can protect the basic interests of both the investor and the government concerned. However, there is a major limitation in using the model, namely it gives no consideration to the impacts of risks on the estimation of various economic variables in the model. This study, considers the risk impacts to the BOTCcM model and presents all additional risk concession model. This model provides an approach for formulating a concession period to consider the impacts of risks and, at the same time, protect the basic interests of both the investor and the government concerned. A hypothetical case is used to show the procedures of formulating the risk concession period through the assistance of the Monte Carlo simulation method.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据