4.7 Article

Case-based reasoning in steel bridge engineering

期刊

KNOWLEDGE-BASED SYSTEMS
卷 18, 期 1, 页码 37-46

出版社

ELSEVIER
DOI: 10.1016/j.knosys.2004.06.001

关键词

bridge engineering; case-based reasoning; design

向作者/读者索取更多资源

The current inventory of the Ohio Department of Transportation (ODOT) contains about 12000 bridges. The great majority of the bridges rated by ODOT engineers are based on the working stress design (WSD) method. The new Federal Highway Administration guidelines require that all bridge ratings be done using the load factor design (LFD) method. Consequently, thousands of bridges have to be re-rated according to the LFD code. The WSD-based data files for existing bridges do not contain the detailed information about steel sections and cross frames needed for the LFD-based rating. In this research a case-based reasoning (CBR) system has been developed to assist the bridge engineer in converting the WSD-based ratings for existing bridges to new LFD-based ratings. A domain model has been created to represent the ODOT standard design cases of bridges. (c) 2004 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据