期刊
IEEE TRANSACTIONS ON POWER SYSTEMS
卷 20, 期 1, 页码 223-229出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2004.841232
关键词
cost-benefit analysis; operating reserve capacity; power market; reliability
Most of the current research on operating reserve markets assumes that the required capacity is predetermined, which means that the demand of operating reserve capacity is inelastic. This paper considers that operating reserve capacity in a power system is flexible and that one should optimize it by cost-benefit analysis. Based on the reliability evaluation of the generation system, a clearing model of the operating reserve market is proposed to determine the optimal reserve capacity and simultaneously clear the operating reserve market. The model is discussed on both uniform-price and pay-as-bid auction mechanisms. By using a heuristic method, we suggest an efficient algorithm to solve the model. Case studies for reliability test system (RTS96) demonstrate the usefulness and efficiency of the proposed model.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据