4.7 Article Proceedings Paper

Complexity of flow shop scheduling problems with transportation constraints

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 161, 期 1, 页码 32-41

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2003.03.002

关键词

flexible manufacturing systems; flow shop; scheduling; complexity

向作者/读者索取更多资源

In most manufacturing and distribution systems, semi-finished jobs are transferred from one processing facility to another by transporters such as Automated Guided Vehicles, robots and conveyors, and finished jobs are delivered to warehouses or customers by vehicles such as trucks. This paper investigates two-machine flow shop scheduling problems taking transportation into account. The finished jobs are transferred from the processing facility and delivered to customers by truck. Both transportation capacity and transportation times are explicitly taken into account in these models. We study the class of flow shop problems by analysing their complexity. For the makespan objective function, we prove that this problem is strongly NP-hard when the capacity of a truck is limited to two or three parts with an unlimited buffer at the output of the each machine. This problem with additional constraints, such as blocking, is also proven to be strongly NP-hard. (C) 2003 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据