4.7 Article Proceedings Paper

Single machine group scheduling with resource dependent setup and processing times

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 162, 期 1, 页码 112-121

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2002.11.004

关键词

scheduling; single machine; group technology; resource allocation; linear programming

向作者/读者索取更多资源

A single machine scheduling problem is studied. There is a partition of the set of n jobs into g groups on the basis of group technology. Jobs of the same group are processed contiguously. A sequence independent setup time precedes the processing of each group. Two external renewable resources can be used to linearly compress setup and job processing times. The setup times are jointly compressible by one resource, the job processing times are jointly compressible by another resource and the level of the resource is the same for all setups and all jobs. Polynomial time algorithms are presented to find an optimal job sequence and resource values such that the total weighted resource consumption is minimum, subject to meeting job deadlines. The algorithms are based on solving linear programming problems with two variables by geometric techniques. (C) 2004 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据