4.7 Article

A multi-objective production smoothing model with compressible operating times

期刊

APPLIED MATHEMATICAL MODELLING
卷 35, 期 7, 页码 3596-3610

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.apm.2011.01.038

关键词

Multi-objective; Multi-product; Multi-period; Production smoothing; Compressible operating time; Available time

向作者/读者索取更多资源

Real life multi-product multi-period production planning often deals with several conflicting objectives while considering a set of technological constraints. The solutions of these problems can provide deeper insights to the decision makers/managers than those of single-objective problems. Some managers want to use from a production plan that is corresponding to minimum change in production policy along with minimum total cost simultaneously as possible. On the other hand, these two objectives have intrinsic conflicts such that producing in a fixed rate will cause huge costs than producing economically or according to ill. So this paper presents a novel multi-objective model for the production smoothing problem on a single stage facility that some of the operating times could be determined in a time interval for. The model is to: (a) smooth the variations of production volume, and (b) minimize total cost of the corresponding production plan, while satisfying a set of technological constraints such as limited available time. The proposed model is developed in a real case study and is solved by a new genetic algorithm. The proposed genetic algorithm uses a novel achievement function for exploring the solution space, based on LP-metric concepts. Computational experiences reveal the sufficiency and efficiency of the proposed approach in contrast to previous researches. (C) 2011 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据