4.8 Article

Wind energy integration into future energy systems based on conventional plants - The case study of Croatia

期刊

APPLIED ENERGY
卷 135, 期 -, 页码 643-655

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2014.06.055

关键词

EnergyPLAN model; NeD model; Large combustion plants; Intermittent renewable energy sources; Critical excess electricity production (CEEP); Load duration curve (LDC)

资金

  1. Croatian Science Foundation [1-4463-2011, 09/128]

向作者/读者索取更多资源

Croatian energy system is currently highly import-dependent and integration of a high share of renewable energy sources needs to be considered. This paper studies eight scenarios; three proposed by the Croatian Energy Strategy, one proposed by the Indicative medium-term development plan of Croatia's Transmission System Operator, and four alternative scenarios that propose extensive construction of hydro, wind and solar power plants in Croatia. Calculations have been conducted in the EnergyPLAN model based on modeled long term energy demand projections in the NeD model, with 2009 as the base year and a scope ranging until the year 2030. Each of the eight proposed scenarios is observed through different hydrological conditions while analyzing import dependency, economic costs and CO2 emissions. After the initial calculations, additional analysis of intensive wind power penetration has been conducted. The Results show that energy systems with a larger share of conventional and nonflexible power plants have more difficulty adjusting to wind power plants production. In case of a high share penetration of wind in a system based upon such power plants, the feasibility of investing in new large combustion plants that will spend most of the time working on minimum capacity is brought into question. (C) 2014 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据