4.3 Article

Manpower allocation with time windows and job-teaming constraints

期刊

NAVAL RESEARCH LOGISTICS
卷 52, 期 4, 页码 302-311

出版社

WILEY
DOI: 10.1002/nav.20075

关键词

manpower scheduling; teams; simulated annealing

向作者/读者索取更多资源

In this work, we study manpower allocation with time windows and job-teaming constraints. A set of jobs at dispersed locations requires teams of different types of workers where each job must be carried out in a preestablished time window and requires a specific length of time for completion. A job is satisfied if the required composite team can be brought together at the job's location for the required duration within the job's time window. The objective is to minimize a weighted sum of the total number of workers and the total traveling time. We show that construction heuristics used with simulated annealing is a good approach to solving this NP-hard problem. In experiments, this approach is compared with solutions found using CPLEX and with lower bounds obtained from a network flow model. (c) 2005 Wiley Periodicals, Inc.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据