Application of 4D for dynamic site layout and management of construction projects

期刊

AUTOMATION IN CONSTRUCTION
卷 14, 期 3, 页码 369-381

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2004.08.011

关键词

site layout; 3D model; 4D CAD; construction management

向作者/读者索取更多资源

Construction schedules and site space arrangement are essential to project management, as they directly influence security, machine running, material deployment, power distribution as well as construction progress and cost. There has been a strong need for more effective planning and management of site space and facilities. This paper introduces a 4D Integrated Site Planning System (4D-ISPS) which integrates schedules, 3D models, resources and site spaces together with 4D CAD technology to provide 4D graphical visualization capability for construction site planning. The features of 4D-ISPS are described in detail. The implementation techniques of this system are also discussed and a real life case is presented. (C) 2004 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据