4.7 Article Proceedings Paper

Particle swarm optimization-based schemes for resource-constrained project scheduling

期刊

AUTOMATION IN CONSTRUCTION
卷 14, 期 3, 页码 393-404

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2004.08.006

关键词

particle swarm optimization; project scheduling; resource-constrained; priority-based representation; permutation-based representation

向作者/读者索取更多资源

Particle swarm optimization (PSO) performed through particle flying along the trajectory that will be continuously updated is based to develop a solution-solving scheme for the resource-con strained project scheduling problem (RCPSP). The potential solution to the RCPSP in view of minimizing project duration is represented by the multidimensional particle, where two solution representations, i.e., priority-based representation and permutation-based representation, are respectively considered. The frameworks of the PSOs for the RCPSP according to the two solution representations are developed. Experimental analyses are presented to investigate the performance of the proposed PSO-based methodology, including comparison of the two representations and comparison with other approaches for the RCPSP. The study aims at providing an alternative means for the RCPSP by utilizing the features of PSO, such as particle-updating mechanism that may benefit from the searching experience of one particle itself or the best of all particles in the swarm. (C) 2004 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据