期刊
AUTOMATION IN CONSTRUCTION
卷 14, 期 4, 页码 477-490出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2004.09.005
关键词
glue logic; parts and packets unification system; active database; RFID; automated handling; dynamic scheduling
In construction production field, inasmuch as various types of disturbance factor existed, it is difficult to manage related information by using conventional model. In this paper, a new concept of parts and packets unified architecture is proposed. Data or information related to a product are carried by product itself and can be handled to manage the whole system. It is a unified controller system which operates parts and packets together. (c) 2004 Published by Elsevier B.V.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据