4.6 Article

Predicting the outcome of construction litigation using boosted decision trees

期刊

JOURNAL OF COMPUTING IN CIVIL ENGINEERING
卷 19, 期 4, 页码 387-393

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)0887-3801(2005)19:4(387)

关键词

-

向作者/读者索取更多资源

Construction litigation has become commonplace in numerous construction projects particularly in large contracts. Miscommunication inadequate plans and specifications rigid contracts, changes in site conditions nonpayment, catch up profits limitations on manpower tools, and equipment, improper supervision notice requirements, constructive changes not recognized as such by owner delays and acceleration measures provoke claims and often result in disputes. A boosted decision tree system was used to predict the outcome of construction litigation. The study was conducted by using the same 114 Illinois court cases that were used in earlier prediction studies conducted with artificial neural networks in 1998 and case-based reasoning in 1999, augmented by an additional 18 cases that were filed in 1990-2000. All cases were extracted from the Westlaw on-line service. The best prediction result obtained with boosted decision trees was 90%. The boosted decision tree model appears to be a promising tool to help create a dispute-free construction industry.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据