4.7 Article

System development for non-unit based repetitive project scheduling

期刊

AUTOMATION IN CONSTRUCTION
卷 14, 期 5, 页码 650-665

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2005.02.003

关键词

construction; scheduling; repetitive; resource; object-oriented

向作者/读者索取更多资源

Repetitive activities are commonly found in construction projects. It is stated in many literatures that repetitive scheduling methods are more effective than traditional CPM methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit based algorithm and a prototype system are developed for the planning and scheduling of repetitive projects. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The developed system takes into consideration (1) the logical relationship of activity groups in a repetitive project, (2) the usage of various resource crews in an activity group, (3) the maintaining of resource continuity, and (4) the time and cost for the routing of resource crews. A sample case study is conducted for system validation, as well as for demonstration. Application of repetitive scheduling methods can be facilitated with the developed system. (c) 2005 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据