A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal

期刊

NAVAL RESEARCH LOGISTICS
卷 53, 期 1, 页码 45-59

出版社

WILEY
DOI: 10.1002/nav.20121

关键词

maritime container terminal; quay crane scheduling; branch-and-cut

向作者/读者索取更多资源

The quay crane scheduling problem consists of determining a sequence of unloading and loading movements for cranes assigned to a vessel in order to minimize the vessel completion time as well as the crane idle times. Idle times originate from interferences between cranes since these roll on the same rails and a minimum safety distance must be maintained between them. The productivity of container terminals is often measured in terms of the time necessary to load and unload vessels by quay cranes, which are the most important and expensive equipment used in ports. We formulate the quay crane scheduling problem as a vehicle routing problem with side constraints, including precedence relationships between vertices. For small size instances our formulation can be solved by CPLEX. For larger ones we have developed a branch-and-cut algorithm incorporating several families of valid inequalities, which exploit the precedence constraints between vertices. (c) 2005 Wiley Periodicals. Inc.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据