4.6 Article

Predetermined intervals for start times of activities in the stochastic project scheduling problem

相关参考文献

注意:仅列出部分参考文献,下载原文获取全部文献信息。
Article Management

Scheduling projects with stochastic activity duration to maximize expected net present value

Matthew J. Sobel et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2009)

Article Operations Research & Management Science

Analysis of supply contracts with commitments and flexibility

Yehuda Bassok et al.

NAVAL RESEARCH LOGISTICS (2008)

Article Statistics & Probability

The cross-entropy method for continuous multi-extremal optimization

Dirk P. Kroese et al.

METHODOLOGY AND COMPUTING IN APPLIED PROBABILITY (2006)

Article Engineering, Industrial

Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result

D Trietsch

INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH (2006)

Article Management

Project scheduling under uncertainty: Survey and research potentials

W Herroelen et al.

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH (2005)

Article Operations Research & Management Science

Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology

I Cohen et al.

ANNALS OF OPERATIONS RESEARCH (2005)

Article Operations Research & Management Science

Application of the cross-entropy method to the buffer allocation problem in a simulation-based environment

G Alon et al.

ANNALS OF OPERATIONS RESEARCH (2005)

Article Engineering, Industrial

On the optimal release time of jobs with random processing times, with extensions to other criteria

SE Elmaghraby

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2001)

Article Engineering, Industrial

Optimal start times under stochastic activity durations

SE Elmaghraby et al.

INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS (2000)