4.5 Article

Strain of heated concrete during two thermal cycles. Part 1: strain over two cycles, during first heating and at subsequent constant temperature

期刊

MAGAZINE OF CONCRETE RESEARCH
卷 58, 期 6, 页码 367-385

出版社

THOMAS TELFORD PUBLISHING
DOI: 10.1680/macr.2006.58.6.367

关键词

-

向作者/读者索取更多资源

This paper presents the strain behaviour of three nuclear reactor type plain unsealed (50-60 N/mm(2)) concretes exposed under 0% and 20% compressive loads to a 14-day two-thermal-cycle test (test temperatures ranging from 100 degrees C to 600 degrees C). A generic approach is taken for wider application and for the in-depth understanding of the behaviour of heated concrete in general. Concrete during the two thermal cycles experiences both expansive and contractive strains. The former includes 'thermal expansion, cracking expansion and chemically induced expansion. The latter includes drying shrinkage, load-induced thermal strain (LITS) during virgin heating, 'delayed' LITS at constant temperature and time-dependent creep. The overall strains during heating, at constant temperature and during cooling reflect both contractive and expansive influences. LITS is absent during cooling and a second heat cycle. A summary of the influences of material and environmental factors upon the thermal strain and LITS of concrete is given indicating first-order, second-order and negligible influences. The role of the thermal instability of concrete depends upon the constituents, and specifically the aggregate type. It is found to be very significant, manifesting itself in crack development and large expansive strains and is most evident when heating/cooling without load to temperatures above 300-400 degrees C. A five-day period at constant temperature following the thermal transient (1 degrees C/min) reveals shrinkage, creep and expansive strains dependent upon temperature-load level and concrete type, emanating from continuation of physico-chemical transformations. The largest strain contribution at constant temperature is from the end of the heating ramp (up to 10 h) to about one day after start of heating. The test regime provided a wider insight into the nature of heated concrete.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据