4.7 Article

Performance improvement of the combined cycle power plant by intake air cooling using an absorption chiller

期刊

ENERGY
卷 31, 期 12, 页码 2036-2046

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.energy.2005.09.010

关键词

air cooler; economics; monthly analysis; uncertainty; gas turbine

向作者/读者索取更多资源

This paper studies how to improve the capacity of the combined cycle (CC) power plant which has been operated for 8 years. The most popular way is to lower intake air temperature to around 15 degrees C (ISO) and 100% RH before entering the air compressor of a gas turbine (GT). Thailand has 3 seasons: winter, summer and rainy season. According to 2003 Bangkok monthly weather data, all year ambient temperature is higher than 15 degrees C. This research proposes a steam absorption chiller (AC) to cool intake air to the desired temperature level. It could increase the power output of a GT by about 10.6% and the CC power plant by around 6.24% annually. In economic analysis, the payback period will be about 3.81 years, internal rate of return 40%, and net present value 19.44 MUS$. (c) 2005 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据