4.2 Article Proceedings Paper

Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithm

期刊

CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS
卷 23, 期 3, 页码 143-160

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/10286600600789300

关键词

rehabilitation; multi-objective optimization; water distribution systems; genetic algorithms

向作者/读者索取更多资源

An increase in breakage frequency and a decrease in system efficiency are observed when pipes become older. Rehabilitation strategies are necessary to face this problem in order to define when, where and how to operate for renewing the pipe system. These strategies are constrained by the amount of funds, which are usually available not in a single instalment but yearly and spread over a time period of several years. A procedure based on a multi-objective genetic algorithm to search for a near-optimal rehabilitation scheduling is proposed. With reference to a fixed time horizon, the goal is to minimize the overall costs of repairing and/or replacing pipes, and to maximize the hydraulic performances of the water network; the constraints are represented by the maximum costs that are allowed yearly, over a pre-selected time spell. A head-driven hydraulic simulator is linked to the optimizer to represent the different hydraulic and breakage scenarios, which become possible in consequence of the rehabilitation schedules generated by the genetic algorithm. Results regarding a simple case study and a real water distribution system show that the proposed procedure has the potential to be a useful tool for rehabilitation scheduling.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据