期刊
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
卷 53, 期 9, 页码 2787-2802出版社
TAYLOR & FRANCIS LTD
DOI: 10.1080/00207543.2014.994075
关键词
assembly flowshop scheduling; shipment punctuality; synchronisation; production simultaneity
资金
- Zhejiang Provincial government
- Hangzhou Municipal government
- Lin'an City government
- HKSAR RGC GRF HKU [712112E]
- National Natural Science Foundation of China [51305376, 51275421]
- University of Hong Kong Small Project Fund
This paper studies a synchronised scheduling problem of production simultaneity and shipment punctuality in a two-stage assembly flowshop system. Production simultaneity seeks to ensure all products belonging to a same customer order are simultaneously completed (at least as close as possible). Shipment punctuality attempts to satisfy orders' individual shipment due dates. We provide two criteria, i.e. mean longest waiting duration and mean earliness and tardiness, for measuring production simultaneity and shipment punctuality, respectively. A synchronised scheduling model is developed by balancing the two criteria using linear weighted sum method. A modified genetic algorithm (GA) is then proposed for solving this model. Numerical studies demonstrate the effectiveness of the proposed approach. The results indicate that considering production simultaneity can remarkably reduce finished products inventory. A prioritised weight combination interval for production simultaneity and shipment punctuality has been suggested. Production simultaneity is affected by the production system configuration, especially in peak seasons.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据